Main purpose
The machine is a special food machine for producing military and civil compressed biscuits. The production process of compress of compressed biscuits: 1. Baking of biscuits. 2. Pulverizing 3. Mixing 4. Pressing 5.Packing. The biscuit compressing machine is a key machine during the production process. The machine is composed of several parts such as mechnical structure, hydraulic system, electric-driven structure and electronic control part. It is equipped with stainless steel hopper and feeding track. Expect feeding, the machine automatically operates in an unattended way. Many machines can be connected by conveyor lines to form a unit for automatic running. If equipped with an automatic feeding part, it can realize full-automatic unattended operation. Manual feeding, automatic pressing, automatic discharging, four-station running and four-mold pressing.
Technical parameters
Model |
ZPW-4 |
Max. tablet pressure(kn) |
180-250 |
Max. tablet diameter(mm) |
40*80 |
Max. filling depth(mm) |
40 |
Max. Tablet thickness(mm) |
10-20 |
Max. working diameter(mm) |
750 |
Turet rotation spped(r/min) |
8 |
Production capacity(pc/h) |
3840 |
Motor power(kw) |
7.5 |
Overall size(mm) |
1240*920*1710 |
Machine weight(kg) |
2000 |
Production process
Tablets
Exhibition room
Certificates
Pre-sale service
1. Help clients to choose the most suitable machine
2. Supply detailed machine instruction,principle of operation
3.ProOur Services
duce the machine according to clients' requirement
After-sale service
1. One year warranty
2. 24 hours online to solve any problem; supply you English manual book and technical support, maintain and install video to help you solve the problem, or dispatch worker to your factory.
FAQ
Q1: What is the warranty for this machine?
A1: 1 year.
Q2: Do you offer oversea installation?
A2: We'll send professional installation engineer to help you install the equipment, and train the operators. But the buyers must take the charge of round trip air ticket and accommodation. Also your should pay engineer $80 per day.
Q3: How long is the lead time?
A3: Generally 25 working days, for special orders, please contact sales manager for confirmation.
Q4: What's the terms of delivery?
A4: Shipping and Air Express as DHL, FedEx, TNT, UPS, EMS, for details, please contact sales manager.
Q5:What's the terms of payment?
A5: TT, L/C.